# Ledge Daily Watch source note — September 13, 2026

Checked: September 13, 2026 6:32 a.m. PDT.

## Official-source findings

- City of Greenwood public pages: greenwood_home: 200, greenwood_news: 200, greenwood_elections: 200, greenwood_council_meetings: 200, greenwood_staff: 200, greenwood_mayor_council: 200. City water and all-open-burning alert text was visible in page extracts.
- City elections/election packages: election page and package page loaded publicly. The public pull did not show an accepted candidate list.
- Public eSCRIBE calendar: Sept. 8 Regular agenda: True, minutes: False; Sept. 8 Committee agenda: True, minutes: False; Sept. 10 Special agenda: True, minutes: False; Aug. 10 Regular minutes visible: True. September meeting minutes/outcomes were not confirmed in this pull.
- DriveBC weather regional API: Grand Forks and Rock Creek warning fields showed `no active warning object`. Previous pull showed `no active warning object`. Today forecast: Grand Forks: Cloudy. A few showers beginning this morning. Amount 5 to 10 mm. High 15. UV index 2 or low.; Rock Creek: Cloudy. A few showers beginning this morning. Amount 5 to 10 mm. High 15. UV index 2 or low.. Tonight: Grand Forks: A few showers ending this evening then mainly cloudy. Fog patches developing after midnight. Low 9.; Rock Creek: A few showers ending this evening then mainly cloudy. Fog patches developing after midnight. Low 9.. Monday forecast period: Grand Forks: Clearing in the morning. Fog patches dissipating in the morning. High 21. UV index 5 or moderate.; Rock Creek: Clearing in the morning. Fog patches dissipating in the morning. High 21. UV index 5 or moderate..
- DriveBC emergency-alert API: empty list.
- EmergencyInfoBC homepage: current emergency pages were visible for other regions, but no Greenwood, Midway, Grand Forks, Rock Creek, Christina Lake, Boundary or Kootenay Boundary evacuation item was found in the text pull.
- DriveBC / BC Wildfire API near Greenwood: current under-100 km entries include N61319 (N61319, 41.7 km, Under Control, 67.1 ha), N61846 (N61846, 41.7 km, Under Control, 0.04 ha), N51996 (N51996, 80.1 km, Under Control, 0.75 ha), N51938 (Ezra Creek, 84.5 km, Under Control, 143.0 ha), N51207 (N51207, 91.0 km, Under Control, 367.8 ha). Compared with the September 12 raw pull: no status, size or nearby-set change detected from the September 12 pull.
- DriveBC road events: changed existing item: Needles Ferry (96.7 km): Required maintenance. Starting Tue Sep 15 until Tue Sep 15. From 5:30 AM to 9:30 AM PDT, Tuesday. Needles Ferry will be shuttling and not maintaining a schedule due to construction at the Needles Terminal.; Needles Ferry (96.8 km): Required maintenance. Starting Mon Sep 14 until Tue Sep 15. From 11:00 PM to 1:00 AM PDT the next day, Monday. Closed.. Close new items: no new under-70-km DriveBC road item found against the September 12 raw pull. Closest relevant items: Spraggett Road (17.0 km): Utility work. Starting Thu Aug 13 until Wed Sep 30. All day, every day. Closed. Work happening between Carson Rd and Almond Gardens Rd W.  Road Closure planned.; Highway 3 (23.1 km): Utility work. Starting Mon Aug 10 until Wed Sep 30. From 6:30 AM to 2:30 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Speed Limit restriction: 60 kmh.; Highway 3B (56.5 km): Road construction. Starting Thu Jul 30. From 7:00 AM to 5:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays.; Highway 3 (63.4 km): Ditch maintenance. Starting Tue Jul 21. All day, Wednesday to Friday. Single lane alternating traffic. Expect minor delays. Watch For Crews and Equipment,.; Highway 3B (75.4 km): Utility work. Starting Wed Aug 12 until Fri Oct 30. From 7:00 AM to 5:00 PM PDT, weekdays. Right lane blocked. Shoulder closed. 50km/h construction speed zone in effect 24/7. Storm main being replaced in the ditch. Eastbound left turns will be restricted for Phase II of the project.; Highway 6 (90.1 km): Road construction. Starting Mon Sep 14. Expect 15 minutes delay. Culvert Replacement along Hwy 6, Slocan Park.; N Naramata Road (93.1 km): Road construction. Starting Tue Sep 8 until Wed Sep 30. All day, every day. Single lane alternating traffic. Expect minor delays.; Highway 6 (96.4 km): Paving operations. Starting Tue Sep 8 until Sat Oct 31. From 6:00 AM to 7:00 PM PDT, Monday to Saturday. Single lane alternating traffic. Watch for traffic control. Possible ferry delays.; Needles Ferry (96.7 km): Required maintenance. Starting Tue Sep 15 until Tue Sep 15. From 5:30 AM to 9:30 AM PDT, Tuesday. Needles Ferry will be shuttling and not maintaining a schedule due to construction at the Needles Terminal.; Needles Ferry (96.7 km): Safety inspection. Starting Tue Sep 22 until Tue Sep 22. From 6:00 PM to 8:00 PM PDT, Tuesday. Out of service..
- Community/institution pages: greenwood_museum: 200, greenwood_library: 200, greenwood_elementary: 200, sd51: 200. Greenwood Elementary has PAC/volunteer/transportation reminder content, but no dated standalone public event was confirmed by the automated pull.
- RDKB public pages returned Cloudflare 403 to automated HTTP checks.
- Public/community checks: Facebook groups return login-wall style pages or limited public shells; Facebook material remains lead-only unless readable and independently confirmed.

## Editorial handling

- Published a dated Daily Watch brief because the homepage should stay current and the official-source pull confirms a useful Sunday safety/civic status: no warning object, no local evacuation item, wet forecast, steady road/fire map, and unresolved candidate/minutes follow-up.
- Did not state any personnel decision, resignation, appointment, fire-department leadership change or Heritage Society grant result.
- Did not publish candidate names. No accepted candidate list was found in the public pull.
- Community lead to pursue: Greenwood Elementary/PAC volunteer and school-start story with a named school/PAC source.
